Operating figures, equity and financial results

Operating data

 U.M.20242023ChangeChange %
WTE confermentkt358.4375.9(17.5)(4.7%)
MBT waste and landfillkt445.0474.0(29.0)(6.1%)
Conferments to composting plantskt159.1156.52.71.7%
Conferments to selection plantskt336.9339.2(2.3)(0.7%)
Intermediated wastekt154.2151.03.22.1%
Liquids treated at plantskt264.0310.1(46.1)(14.9%)
Waste producedkt460.4484.3(24.0)(4.9%)
EWTE net electricity soldGWh253.7278.3(24.6)(8.9%)

Economic and financial results

€ million20242023ChangeChange %
Revenues305.2334.3(29.0)(8.7%)
Costs237.3249.9(12.6)(5.0%)
EBITDA67.984.4(16.4)(19.5%)
Operating profit/(loss)(3.5)25.4(28.9)(113.9%)
Average workforce826875(49)(5.6%)
Capex100.338.961.5158.0%

EBITDA (EBITDA)

€ million20242023ChangeChange %
EBITDA Environment segment67.984.4(16.4)(19.5%)
EBITDA – Group1,556.81,390.9166.011.9%
Percentage4.4%6.1%(1.7 p,p,) 

The Environment segment closed 2024 with an EBITDA of €67.9 million, down by €16.4 million (- 19.5 % over the previous year). The variation can be attributed to lower margins on WTE linked to the energy scenario mainly at the San Vittore plant (-€15.1 million), and the downtime of the Terni plant (-€1.2 million), partly offset by high delivery prices (+€6.1 million). MBT and landfill also fell due to the collapse of the landfill tank at Cirsu (-€4.0 million), partly offset by the higher profit posted by Orvieto Ambiente (+€2.2 million). Finally, the recycling sector also saw a decline (-€2.8 million) due to both lower quantities and as a result of plastic prices (-€2.2 million). The average number of employees as at 31 December 2024 was 826, slightly lower than at 31 December 2023. 

Investments in the sector came to €100.3 million (+€61.5 million compared to 31 December 2023). This change was mainly influenced by investments for revamping works on the Terni smoke line (+€17.4 million) and works on the 4th San Vittore line (+€51.8 million). The increase was offset by the decrease recorded by AS Recycling (-€2.0 million) mainly attributable to the construction of the plastic SRF recycling plant in Borgorose in the previous year.